Uncategorized

711 N HIGH STREET

711 N HIGH STREET

ACP teamed up with Dugan & Meyers to bring 711 to the Short North in Columbus, OH. This building features offices as well a restaurant on the first floor and a rooftop bar and restaurant on the ninth floor. ACP started working for this project in the early spring of 2018 and finished up working in spring 2019. ACP was contracted to do the drywall and acoustic ceilings for $1.3 Million.

Read More →

Read More →

ART VAN FURNITURE STORE

ART VAN FURNITURE STORE

ACP and Equity Construction Solutions, LLC, teamed up to help Art Van add a new location to the Polaris Fashion Place located just north of Columbus, OH. ACP finished up working at Art Van Furniture Store in early spring 2019.

Read More →

Read More →

OU SHIVELY DINING HALL

OU SHIVELY DINING HALL

ACP had the honor of teaming up with Barton Malow to help completely renovate Shively Dining Hall at Ohio University located in Athens, Ohio. ACP helped with the ceilings, drywall, soffits, columns, and a planter located in the middle of the dining room. This project was started in May 2018 and is finishing up in August 2018 so the students will have access to use it as schools begins.

Read More →

Read More →

CHILLICOTHE SCHOOLS

CHILLICOTHE SCHOOLS

ACP has teamed up with Summit Construction to help the Chillicothe School District build two new schools. Both schools began construction in fall of 2017.  One is their Primary School located on the corner of Mill Street and Cherry Street on the eastern side of Chillicothe. Less than a mile away on Arch Street, ACP is helping to build their Intermediate School. The Primary School is scheduled to be finished up in August 2018 so they can begin school in the new building. The Intermediate School has a completion time frame of December 2018 so they can begin school in the new building come January 2019. It’s been a pleasure […]

Read More →

Read More →

80 ON THE COMMONS

80 ON THE COMMONS

  Located on the south eastern side of the Columbus Commons this 12-story new build is an amazing addition to Downtown Columbus. ACP teamed up with Daimler on this project that was started in August of 2017 and will be finished and ready for people to move in Summer 2018. It is a mixed use building that will have retail, offices and apartments. ACP did $1.8 Million worth of drywall, framing, and acoustic ceilings in this development.

Read More →

Read More →

THE RAM: RESTAURANT & BREWERY

THE RAM: RESTAURANT & BREWERY

The Ram Restaurant & Brewery was a project that ACP assisted in building with Elford, Inc. that was finished in 2016. It’s located in the Short North in Columbus, Ohio. ACP was contracted to do $130,000 worth of work for this job. In 2017, the Ram Restaurant & Brewery hired the same team to help build their Dublin, Ohio location, which made it the first brewery in Dublin, Ohio. ACP was contracted to do $150,000 worth of work for this project.

Read More →

Read More →

FIRST & MAIN OF LEWIS CENTER

FIRST & MAIN OF LEWIS CENTER

ACP teamed up with Triangle Associates to build First & Main of Lewis Center. First & Main of Lewis Center is an assisted living community located by 23 Columbus Pike and East Powell Road. ACP was contracted to do all the drywall, and acoustic ceilings. This project was $2.2 Million for ACP and finished working on this project in 2017.

Read More →

Read More →

OHIO STATE VETERINARY HOSPITAL

OHIO STATE VETERINARY HOSPITAL

ACP originally started working at The Ohio State Veterinary Hospital with Elford, Inc. back in late 2015. The original contract was for $350,000. In 2016, ACP went back to do more work and added on $1.6 Million to the project and finished up working in late 2017. ACP was hired to do all the framing, drywall, and acoustic ceilings for the building. The Ohio State Veterinary Hospital is located close to The Shoe on Ohio State’s campus by the Olentangy River.

Read More →

Read More →

LEVEQUE TOWER

LEVEQUE TOWER

In 2015, LeVeque Tower contracted ACP along with Elford, Inc. to do the drywall finishing on Marriot Hotel in LeVeque Tower which is the 1st through the 10th floor, along with The Keep, which is the bar on the 2nd Floor in LeVeque Tower. The LeVeque Tower is located in Downtown Columbus close to the Scioto Mile by the Riverfront. In 2016, ACP added drywall finish to the 28th floor as well. This was a $4.4 million project all together.

Read More →

Read More →

BAKER HOSTETLER

BAKER HOSTETLER

The law offices of Baker Hostetler hired Elford, Inc. and ACP to do the remolding of their offices. ACP did the ceilings and paneling for their offices located on the 10-13 floors of their building in Downtown Columbus by the Riverfront. This $1.2 million project was started in fall 2016 and finished up in summer 2017.

Read More →

Read More →

Top