LEVEQUE TOWER

LEVEQUE TOWER

In 2015, LeVeque Tower contracted ACP along with Elford, Inc. to do the drywall finishing on Marriot Hotel in LeVeque Tower which is the 1st through the 10th floor, along with The Keep, which is the bar on the 2nd Floor in LeVeque Tower. The LeVeque Tower is located in Downtown Columbus close to the Scioto Mile by the Riverfront. In 2016, ACP added drywall finish to the 28th floor as well. This was a $4.4 million project all together.

Read More →

Read More →

BAKER HOSTETLER

BAKER HOSTETLER

The law offices of Baker Hostetler hired Elford, Inc. ACP to do the remolding of their offices. ACP did the ceilings and paneling for their offices located on the 10-13 floors of their building in Downtown Columbus by the Riverfront. This $1.2 million project was started in fall 2016 and finished up in summer 2017.

Read More →

Read More →