LEVEQUE TOWER

In 2015, LeVeque Tower contracted ACP along with Elford, Inc. to do the drywall finishing on Marriot Hotel in LeVeque Tower which is the 1st through the 10th floor. The LeVeque Tower is located in Downtown Columbus close to the Scioto Mile by the Riverfront. In 2016, ACP added drywall finish to the 28th floor as well. This was a $4.4 million project all together.

Top